Rail

Southern Cross Station (Platforms 15 & 16)

Summit Formwork are experienced in Rail Infrastructure Construction.  From structures that support rail & platforms, to structures forming part of the station themselves, as well as structures to allow pedestrian/ vehicle access to the station itself.  We have completed several contracts at Southern Cross Station, ranging from construction of site amenities through to complex reinforced structures within a live rail environment.  With successful outcomes for all contracts completed at Southern Cross Station we are confident in our ability to not only meet but exceed your requirements for a Structural Contractor in a rail environment.

Summit Formwork has a wide range of Rail Approved plant and equipment, with all key personnel rail inducted and track side experienced. With a federally compliant Occupational Health and Safety Management Plan, Summit will work with you to ensure successful and safe project outcomes.

Rail Inducted/ Track Side Experienced Personnel

  • Plant & Machinery Operators
  • Formwork Carpenters
  • Steel Fixers
  • Concreters
  • Dogmen & Riggers
  • Laborers
  • Surveyors

Rail Approved plant and equipment

  • 15  Tonne Excavator
  • 5.5 Tonne Excavator
  • 1.6 Tonne Excavator
  • 3 Tonne Dumper
  • Bobcat
  • Tip Trucks

Project Gallery

Click on an image below to view an enlarged version:

Formwork

Concrete Formwork

Over the past decade, Summit Formwork has developed a reputation for consistency and flexibility in a range of areas including conventional formwork, table formwork, Peri formwork and more

read more

Excavation

Excavation

Summit Forwork are able to undertake bulk excavation and detail excavation - we have a wide range of plant equipment that enables us to scale according to your project's requirements.

read more

Reinforcement

Reinforcement

Summit Formwork provides reinforcement supply and installation as part of our full concrete structure package.

read more

The PERI Formwork System

Peri Formwork

With the SKYDECK drophead system, striking can be carried out after only one day (depending on the slab thickness and strength of the concrete)

read more